Bengaluru

20 Years of Neglect: HBR Layout Drowns in KJ George & BBMP’s Failures

"Monsoon Misery: Bengaluru’s HBR Layout Floods as Politicians Look Away""20 Years of Neglect: HBR Layout Drowns in BBMP’s Failures"

#BengaluruRains: HBR Layout Residents Battle Chronic Flooding Amid Alleged MLA & BBMP Negligence


Residents Left in Lurch as Rains Expose BBMP’s Substandard Work

Every monsoon, HBR Layout in Bengaluru’s Sarvagnanagar Assembly Constituency turns into a nightmare for its residents. Streets transform into swimming pools, gutters overflow into homes, and the stench of stagnant sewage fills the air. Despite repeated promises from politicians and officials, the flooding crisis persists—year after year, administration after administration.

This time is no different. Heavy rains have once again exposed the shoddy drainage systems and poorly maintained infrastructure, leaving residents grappling with property damage, health hazards, and financial strain.


A Two-Decade-Long Crisis with No Solution in Sight

For nearly 20 years, areas like HBR 3rd Block (Matekar Street), 4th Block (near Forest Park), 5th Block (Hennur Village), Nagwara (behind KEB), and Arogya Amma Layout have faced severe waterlogging. The situation is so dire that many are forced to abandon their homes and seek shelter elsewhere.

“The MLA from this constituency, KJ George, has won four times. Is he unaware of our suffering?” questioned Yaseen Qumaini, Aam Aadmi Party Bengaluru Organizing Secretary. “Ministers and MLAs visit, survey, make promises, and vanish. The only thing that gets delivered is substandard work, thanks to corruption between politicians and contractors.”

The Raja Kaluve (stormwater drain), built at a cost of crores, has failed to alleviate flooding. Poor maintenance and blocked connecting drains render it useless, allowing rainwater to gush into homes.


Political Visits, Empty Promises

Chief Minister Siddaramaiah, Deputy CM DK Shivakumar, former CM BS Bommai, Opposition Leader R Ashoka, and MP PC Mohan have all visited HBR Layout over the years. Yet, residents say no concrete action has followed.

“We’ve submitted countless complaints to BBMP, but nothing changes,” said Pratap, former president of the HBR Layout Residents’ Welfare Association (RWA). “Funds are released, but corruption ensures they never reach the actual work. Contractors deliver pathetic quality, and officials turn a blind eye.”

Niranjan, another RWA member, added, “The roads near Manyata Tech Park and Frazer Town are death traps. Potholes filled with rainwater have caused accidents and even fatalities. But who cares?”


Systemic Corruption, Public Suffering

Locals allege a well-oiled machinery of kickbacks between politicians, BBMP officials, and contractors. Abdul Hafeez Khalid, a resident, said, “Every monsoon, we face the same horror. The government doesn’t hold BBMP accountable. They just wait for the media to highlight the issue, then do temporary fixes.”

Babu Anna, a long-time resident, echoed the frustration: “Ministers come, take photos, and leave. The engineers hand over contracts to their favored firms, and the work vanishes within months. We’re tired of this cycle.”


Demands for Accountability Grow

Activists and residents are now demanding strict action against negligent officials and contractors. Azhar, a local activist, said, “If crores are spent, why does flooding worsen? The MLA and ministers must answer—why has this issue persisted for two decades?”

Tajammul Pasha, another resident, warned, “If the government doesn’t act now, we will escalate protests. We won’t let them ignore us anymore.”

"20 Years of Neglect: HBR Layout Drowns in BBMP’s Failures"
“20 Years of Neglect: HBR Layout Drowns in BBMP’s Failures”

What’s Next?

With forecasts predicting more rain, HBR Layout braces for another round of misery. The question remains: Will the government finally intervene, or will residents endure another year of neglect?

For now, the people of HBR Layout continue their fight—against the rains, against the system, and against apathy.


### Key Affected Areas:

  • 3rd Block (Matekar Street)

  • 4th Block (Near Forest Park)

  • 5th Block (Hennur Village)

  • Nagwara (Behind KEB)

  • Arogya Amma Layout

  • HBR 2nd Stage (6th & 7th Cross)

### Authorities Contacted for Response:

  • BBMP Commissioner’s Office

  • KJ George, MLA (Sarvagnanagar) & Energy Minister

  • CM Siddaramaiah’s Office

  • DCM DK Shivakumar’s Office

(No official response was received at the time of publishing.)


#BengaluruRains #HBRLayout #BBMPFail #KarnatakaGovt #UrbanFlooding

Statements / Quotes

  1. Yaseen Qumaini (AAP Bengaluru Organizing Secretary)

    • “The MLA from this constituency, KJ George, has won four times. Is he unaware of our suffering? Ministers and MLAs visit, survey, make promises, and vanish. The only thing that gets delivered is substandard work, thanks to corruption between politicians and contractors.”

  2. Pratap (Ex-President, RWA HBR Layout)

    • “We’ve submitted countless complaints to BBMP, but nothing changes. Funds are released, but corruption ensures they never reach the actual work. Contractors deliver pathetic quality, and officials turn a blind eye.”

  3. Niranjan (RWA Member, HBR Layout)

    • “The roads near Manyata Tech Park and Frazer Town are death traps. Potholes filled with rainwater have caused accidents and even fatalities. But who cares?”

  4. Abdul Hafeez Khalid (Local Resident)

    • “Every monsoon, we face the same horror. The government doesn’t hold BBMP accountable. They just wait for the media to highlight the issue, then do temporary fixes.”

  5. Babu Anna (Local Resident)

    • “Ministers come, take photos, and leave. The engineers hand over contracts to their favored firms, and the work vanishes within months. We’re tired of this cycle.”

  6. Azhar (Activist)

    • “If crores are spent, why does flooding worsen? The MLA and ministers must answer—why has this issue persisted for two decades?”

  7. Tajammul Pasha (Local Resident)

    • “If the government doesn’t act now, we will escalate protests. We won’t let them ignore us anymore.”


Q&A  

Q: Why has HBR Layout’s flooding problem not been resolved in 20 years?
A (Yaseen Qumaini): “Because politicians and contractors profit from corruption. Funds meant for drainage and roads are siphoned off, and no one is held accountable.”

Q: What’s the immediate solution needed?
A (Pratap, RWA): “BBMP must clean all drains, fix the Raja Kaluve, and audit past contracts. Officials who approved substandard work must be punished.”

Q: What’s the residents’ next step?
A (Azhar, Activist): “If the government ignores us, we’ll organize larger protests and approach the courts. Enough is enough.”

Loading

News Desk
the authorNews Desk

Leave a Reply